Deal Value Modeller

See what the 40/60 model means for your deal.

Move the sliders to model the value at stake, how much of our fee is actually at risk, and what waiting is costing you. Illustrative, and yours in about a minute.

  • Upside and cost-of-delay in one view
  • Built around the 40/60 risk-share model
  • Board-ready breakdown on request

Model RCK's 40/60 fee: 40% of the agreed fee is billed on time as delivered; the outstanding 60% releases in tranches at each 8-week sprint checkpoint, paid only once that sprint's target is independently verified. This isn't gain-share — RCK is never paid more than the agreed fee, whatever the actual result.

£100.0M
10%
10%

Sets the size of the outstanding 60% at signing, released in equal tranches at each 8-week sprint checkpoint — fixed from that point, not a share that grows with results.

3 sprints · 24 wks · ~5.5 mo
£1.8k/day

Illustrative model, not a quote. Fee shown split 40% billed on time / 60% held back and released in 8-week sprint tranches pending independent verification, in line with RCK's 40/60 fee model. This is not gain-share or profit-sharing — RCK never receives more than the fee agreed at signing, whatever the actual result. Day rate, team-size and sprint-scheduling figures are illustrative and subject to final pricing.

Outstanding fee — 60% · held back£1.00M

The remaining 60% of the agreed fee, released in tranches at each sprint checkpoint once the client sponsor signs off — not an additional share of value created.

Time-based fee — 40% · billed as delivered£666.7k

≈370 days across a ~4-person team over 3 sprints (24 weeks) at £1.8k/day/person (~30.9 days/sprint/person).

40%60%
Time-based · £666.7kOutstanding · £1.00M
Full agreed fee£1.67M

The full agreed fee. RCK never receives more than this, however much value the programme actually creates.

Each sprint's tranche is independent. Miss a checkpoint and RCK does not earn that sprint's slice of the outstanding fee — not the whole £1.67M at once.

What's contingent on verification

The outstanding fee doesn't wait for one lump verification at programme end — it releases sprint by sprint. Toggle a checkpoint off to simulate a missed sprint.

  • £333.3kverified · released
  • £333.3kverified · released
  • £333.3kverified · released
Realised so far£1.67M of £1.67M

Not gain-share: RCK's fee is fixed at signing either way. This is the share of that fixed fee RCK stands to lose, sprint by sprint, if outcomes are never verified — not a bigger share of anything if it over-delivers.

US$120Mtarget
US$128Mdelivered
107%of target

A track record, not a promise of extra fee — RCK was paid the fee agreed for that programme’s target, nothing more for the 7% it delivered beyond it.

Get the board-ready breakdown

Unlock the conservative / base / stretch target scenarios and get a tailored version emailed to you. A partner follows up within one business day.

Illustrative figures. No spam — one follow-up from a partner.